CR 650N over Plum Creek
FairPosted for loadPutnam County, Indiana · 00.20 E of CR 600 E · Structure no. 6700036
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 31 ft
- 1 main span
- Daily traffic
- 240
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
CR 650N over Plum Creek is a concrete stringer/multi-beam or girder carrying CR 650N over Plum Creek in Putnam County, Indiana. It was built in 1955, so it is 70 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 240 vehicles a day, roughly 3% of them trucks, projected to reach 330 by 2043. The structure is 31 ft (9.3 m) long and 22 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 650N over Plum Creek built?
It was built in 1955, making it 70 years old in 2025.
What condition is CR 650N over Plum Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does CR 650N over Plum Creek carry?
About 240 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is CR 650N over Plum Creek?
The structure is 31 ft (9.3 m) long with a longest span of 29 ft (8.9 m) and a deck 22 ft wide.
Who owns CR 650N over Plum Creek?
It is owned by the County Highway Agency.