US Bridges

Pumpkin Run Road over I-64 Eb/Wb

Good

Posey County, Indiana · 02.65 W SR 165 · Structure no. 033300

Built
1967
58 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
200 ft
2 main spans
Daily traffic
301
2004 count
Owner
State
State Highway Agency

About this bridge

Pumpkin Run Road over I-64 Eb/Wb is a steel continuous stringer/multi-beam or girder carrying Pumpkin Run Road over I-64 Eb/Wb in Posey County, Indiana. It was built in 1967, so it is 58 years old, older than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 301 vehicles a day, roughly 10% of them trucks, projected to reach 499 by 2034. The structure is 200 ft (60.9 m) long and 31 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesPumpkin Run Road
CrossesI-64 Eb/Wb
Location02.65 W SR 165
RouteCounty Highway 0
StateIndiana
Coordinates38.18801, -87.82833
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating34 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length200 ft (60.9 m)
Longest span98 ft (29.8 m)
Deck width31 ft (9.6 m)
Roadway width27 ft (8.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic301 (2004)
Projected traffic499 by 2034
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pumpkin Run Road over I-64 Eb/Wb built?

It was built in 1967, making it 58 years old in 2025.

What condition is Pumpkin Run Road over I-64 Eb/Wb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Pumpkin Run Road over I-64 Eb/Wb carry?

About 301 vehicles per day (2004 count), of which roughly 10% are trucks.

How long is Pumpkin Run Road over I-64 Eb/Wb?

The structure is 200 ft (60.9 m) long with a longest span of 98 ft (29.8 m) and a deck 31 ft wide.

Who owns Pumpkin Run Road over I-64 Eb/Wb?

It is owned by the State Highway Agency.