SR 66 over Clear Creek
FairPosey County, Indiana · 03.28 E SR 165 · Structure no. 023340
- Built
- 1932
- 93 years old, rebuilt 1964
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 46 ft
- 1 main span
- Daily traffic
- 8,081
- 2004 count
- Owner
- State
- State Highway Agency
About this bridge
SR 66 over Clear Creek is a concrete stringer/multi-beam or girder carrying SR 66 over Clear Creek in Posey County, Indiana. It was built in 1932 and reconstructed in 1964, so it is 93 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,081 vehicles a day, roughly 10% of them trucks, projected to reach 11,192 by 2032. The structure is 46 ft (14 m) long and 32 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 66 over Clear Creek built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1964.
What condition is SR 66 over Clear Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does SR 66 over Clear Creek carry?
About 8,081 vehicles per day (2004 count), of which roughly 10% are trucks.
How long is SR 66 over Clear Creek?
The structure is 46 ft (14 m) long with a longest span of 40 ft (12.1 m) and a deck 32 ft wide.
Who owns SR 66 over Clear Creek?
It is owned by the State Highway Agency.