US Bridges

SR 65 over Big Creek

Good

Posey County, Indiana · 00.99 S SR 68 · Structure no. 023190

Built
1993
32 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
153 ft
3 main spans
Daily traffic
1,042
2021 count
Owner
State
State Highway Agency

About this bridge

SR 65 over Big Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 65 over Big Creek in Posey County, Indiana. It was built in 1993, so it is 32 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,042 vehicles a day, roughly 12% of them trucks, projected to reach 1,063 by 2041. The structure is 153 ft (46.6 m) long and 48 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSR 65
CrossesBig Creek
Location00.99 S SR 68
RouteState Highway 65
StateIndiana
Coordinates38.17345, -87.709
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.7 US tons
Inventory rating42.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length153 ft (46.6 m)
Longest span51 ft (15.4 m)
Deck width48 ft (14.7 m)
Roadway width45 ft (13.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,042 (2021)
Projected traffic1,063 by 2041
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 65 over Big Creek built?

It was built in 1993, making it 32 years old in 2025.

What condition is SR 65 over Big Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SR 65 over Big Creek carry?

About 1,042 vehicles per day (2021 count), of which roughly 12% are trucks.

How long is SR 65 over Big Creek?

The structure is 153 ft (46.6 m) long with a longest span of 51 ft (15.4 m) and a deck 48 ft wide.

Who owns SR 65 over Big Creek?

It is owned by the State Highway Agency.