US Bridges

CR 750N over I-69 Nb/Sb

Good

Pike County, Indiana · 03.49 N SR 356 · Structure no. 080186

Built
2012
13 years old
Condition
Good
inspected January 2023
Type
Tee Beam
Prestressed Concrete Continuous
Length
246 ft
2 main spans
Daily traffic
140
2010 count
Owner
State
State Highway Agency

About this bridge

CR 750N over I-69 Nb/Sb is a prestressed concrete continuous tee beam carrying CR 750N over I-69 Nb/Sb in Pike County, Indiana. It was built in 2012, so it is 13 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 140 vehicles a day, roughly 15% of them trucks, projected to reach 160 by 2030. The structure is 246 ft (74.9 m) long and 30 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesCR 750N
CrossesI-69 Nb/Sb
Location03.49 N SR 356
RouteCounty Highway 0
StateIndiana
Coordinates38.53144, -87.20935
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.3 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length246 ft (74.9 m)
Longest span121 ft (36.8 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic140 (2010)
Projected traffic160 by 2030
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 750N over I-69 Nb/Sb built?

It was built in 2012, making it 13 years old in 2025.

What condition is CR 750N over I-69 Nb/Sb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does CR 750N over I-69 Nb/Sb carry?

About 140 vehicles per day (2010 count), of which roughly 15% are trucks.

How long is CR 750N over I-69 Nb/Sb?

The structure is 246 ft (74.9 m) long with a longest span of 121 ft (36.8 m) and a deck 30 ft wide.

Who owns CR 750N over I-69 Nb/Sb?

It is owned by the State Highway Agency.