SR 3 NB over NS RR
GoodNoble County, Indiana · 00.53 S US 6 · Structure no. 001359
- Built
- 1991
- 34 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 155 ft
- 3 main spans
- Daily traffic
- 5,938
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
SR 3 NB over NS RR is a steel continuous stringer/multi-beam or girder carrying SR 3 NB over NS RR in Noble County, Indiana. It was built in 1991, so it is 34 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,938 vehicles a day, roughly 7% of them trucks, projected to reach 7,722 by 2032. The structure is 155 ft (47.2 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 3 NB over NS RR built?
It was built in 1991, making it 34 years old in 2025.
What condition is SR 3 NB over NS RR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does SR 3 NB over NS RR carry?
About 5,938 vehicles per day (2019 count), of which roughly 7% are trucks.
How long is SR 3 NB over NS RR?
The structure is 155 ft (47.2 m) long with a longest span of 60 ft (18.2 m) and a deck 44 ft wide.
Who owns SR 3 NB over NS RR?
It is owned by the State Highway Agency.