US Bridges

Gordon Pike over Clear Creek

Good

Monroe County, Indiana · 0.1 Mi. East of Rogers ST · Structure no. 5300181

Built
2019
6 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
227 ft
4 main spans
Daily traffic
10,652
2014 count
Owner
County
County Highway Agency

About this bridge

Gordon Pike over Clear Creek is a prestressed concrete continuous box beam or girders - single or spread carrying Gordon Pike over Clear Creek in Monroe County, Indiana. It was built in 2019, so it is 6 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,652 vehicles a day, roughly 5% of them trucks, projected to reach 19,089 by 2034. The structure is 227 ft (69.2 m) long and 64 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesGordon Pike
CrossesClear Creek
Location0.1 Mi. East of Rogers ST
RouteCity Street 0
StateIndiana
Coordinates39.12152, -86.53741
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating41.1 US tons
Inventory rating31.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length227 ft (69.2 m)
Longest span61 ft (18.5 m)
Deck width64 ft (19.6 m)
Roadway width47 ft (14.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,652 (2014)
Projected traffic19,089 by 2034
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Gordon Pike over Clear Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Gordon Pike over Clear Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Gordon Pike over Clear Creek carry?

About 10,652 vehicles per day (2014 count), of which roughly 5% are trucks.

How long is Gordon Pike over Clear Creek?

The structure is 227 ft (69.2 m) long with a longest span of 61 ft (18.5 m) and a deck 64 ft wide.

Who owns Gordon Pike over Clear Creek?

It is owned by the County Highway Agency.