US Bridges

I-69 NB over W Tramway RD

Good

Monroe County, Indiana · 01.79 S SR 37 · Structure no. 079936

Built
2015
10 years old
Condition
Good
inspected February 2024
Type
Tee Beam
Prestressed Concrete
Length
74 ft
1 main span
Daily traffic
12,818
2014 count
Owner
State
State Highway Agency

About this bridge

I-69 NB over W Tramway RD is a prestressed concrete tee beam carrying I-69 NB over W Tramway RD in Monroe County, Indiana. It was built in 2015, so it is 10 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,818 vehicles a day, roughly 21% of them trucks, projected to reach 15,381 by 2034. The structure is 74 ft (22.5 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-69 NB
CrossesW Tramway RD
Location01.79 S SR 37
RouteInterstate 69
StateIndiana
Coordinates39.08588, -86.57343
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.6 US tons
Inventory rating37.1 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length74 ft (22.5 m)
Longest span70 ft (21.3 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,818 (2014)
Projected traffic15,381 by 2034
Trucks21%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-69 NB over W Tramway RD built?

It was built in 2015, making it 10 years old in 2025.

What condition is I-69 NB over W Tramway RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does I-69 NB over W Tramway RD carry?

About 12,818 vehicles per day (2014 count), of which roughly 21% are trucks.

How long is I-69 NB over W Tramway RD?

The structure is 74 ft (22.5 m) long with a longest span of 70 ft (21.3 m) and a deck 43 ft wide.

Who owns I-69 NB over W Tramway RD?

It is owned by the State Highway Agency.