US Bridges

Kinser Pike over I-69 Nb/Sb

Good

Monroe County, Indiana · 02.47 N of SR46 · Structure no. 079016

Built
2016
9 years old
Condition
Good
inspected January 2023
Type
Tee Beam
Prestressed Concrete Continuous
Length
217 ft
2 main spans
Daily traffic
1,084
2016 count
Owner
State
State Highway Agency

About this bridge

Kinser Pike over I-69 Nb/Sb is a prestressed concrete continuous tee beam carrying Kinser Pike over I-69 Nb/Sb in Monroe County, Indiana. It was built in 2016, so it is 9 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,084 vehicles a day, roughly 1% of them trucks, projected to reach 1,756 by 2035. The structure is 217 ft (66.1 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesKinser Pike
CrossesI-69 Nb/Sb
Location02.47 N of SR46
RouteCounty Highway 0
StateIndiana
Coordinates39.22195, -86.54942
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure9 ExcellentNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating38.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length217 ft (66.1 m)
Longest span110 ft (33.5 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (10.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,084 (2016)
Projected traffic1,756 by 2035
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Kinser Pike over I-69 Nb/Sb built?

It was built in 2016, making it 9 years old in 2025.

What condition is Kinser Pike over I-69 Nb/Sb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does Kinser Pike over I-69 Nb/Sb carry?

About 1,084 vehicles per day (2016 count), of which roughly 1% are trucks.

How long is Kinser Pike over I-69 Nb/Sb?

The structure is 217 ft (66.1 m) long with a longest span of 110 ft (33.5 m) and a deck 39 ft wide.

Who owns Kinser Pike over I-69 Nb/Sb?

It is owned by the State Highway Agency.