US Bridges

Fullerton Pike over I-69 Nb/Sb

Good

Monroe County, Indiana · 01.80 S SR 45 · Structure no. 079004

Built
2017
8 years old
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
227 ft
2 main spans
Daily traffic
3,686
2021 count
Owner
State
State Highway Agency

About this bridge

Fullerton Pike over I-69 Nb/Sb is a prestressed concrete continuous stringer/multi-beam or girder carrying Fullerton Pike over I-69 Nb/Sb in Monroe County, Indiana. It was built in 2017, so it is 8 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,686 vehicles a day, roughly 4% of them trucks, projected to reach 41,027 by 2035. The structure is 227 ft (69.2 m) long and 73 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesFullerton Pike
CrossesI-69 Nb/Sb
Location01.80 S SR 45
RouteCounty Highway 0
StateIndiana
Coordinates39.12224, -86.57123
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating34.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length227 ft (69.2 m)
Longest span119 ft (36.2 m)
Deck width73 ft (22.2 m)
Roadway width54 ft (16.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,686 (2021)
Projected traffic41,027 by 2035
Trucks4%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fullerton Pike over I-69 Nb/Sb built?

It was built in 2017, making it 8 years old in 2025.

What condition is Fullerton Pike over I-69 Nb/Sb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does Fullerton Pike over I-69 Nb/Sb carry?

About 3,686 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is Fullerton Pike over I-69 Nb/Sb?

The structure is 227 ft (69.2 m) long with a longest span of 119 ft (36.2 m) and a deck 73 ft wide.

Who owns Fullerton Pike over I-69 Nb/Sb?

It is owned by the State Highway Agency.