South Upas Road over Yellow River
GoodMarshall County, Indiana · 00.50 N of W 14 B Road · Structure no. 5000155
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 203 ft
- 3 main spans
- Daily traffic
- 270
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
South Upas Road over Yellow River is a prestressed concrete continuous box beam or girders - single or spread carrying South Upas Road over Yellow River in Marshall County, Indiana. It was built in 2023, so it is 2 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 270 vehicles a day, roughly 10% of them trucks, projected to reach 332 by 2044. The structure is 203 ft (61.9 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Upas Road over Yellow River built?
It was built in 2023, making it 2 years old in 2025.
What condition is South Upas Road over Yellow River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does South Upas Road over Yellow River carry?
About 270 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is South Upas Road over Yellow River?
The structure is 203 ft (61.9 m) long with a longest span of 70 ft (21.3 m) and a deck 31 ft wide.
Who owns South Upas Road over Yellow River?
It is owned by the County Highway Agency.