US Bridges

W Connector Road over Pleasant Run Creek

Good

Marion County, Indiana · 0.18 S. Wicker Road · Structure no. 4900706

Built
2021
4 years old
Condition
Good
inspected September 2023
Type
Tee Beam
Prestressed Concrete Continuous
Length
418 ft
3 main spans
Daily traffic
3,800
2021 count
Owner
County
County Highway Agency

About this bridge

W Connector Road over Pleasant Run Creek is a prestressed concrete continuous tee beam carrying W Connector Road over Pleasant Run Creek in Marion County, Indiana. It was built in 2021, so it is 4 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,800 vehicles a day, roughly 2% of them trucks, projected to reach 5,300 by 2045. The structure is 418 ft (127.3 m) long and 46 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesW Connector Road
CrossesPleasant Run Creek
Location0.18 S. Wicker Road
RouteCity Street 0
StateIndiana
Coordinates39.63902, -86.20622
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.1 US tons
Inventory rating43.2 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length418 ft (127.3 m)
Longest span139 ft (42.4 m)
Deck width46 ft (14.1 m)
Roadway width43 ft (13.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,800 (2021)
Projected traffic5,300 by 2045
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was W Connector Road over Pleasant Run Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is W Connector Road over Pleasant Run Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does W Connector Road over Pleasant Run Creek carry?

About 3,800 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is W Connector Road over Pleasant Run Creek?

The structure is 418 ft (127.3 m) long with a longest span of 139 ft (42.4 m) and a deck 46 ft wide.

Who owns W Connector Road over Pleasant Run Creek?

It is owned by the County Highway Agency.