Brookville Road over Shadeland Avenue Nb/Sb
PoorMarion County, Indiana · 00.47 W I-465 · Structure no. 4900649
- Built
- 1961
- 64 years old, rebuilt 1988
- Condition
- Poor
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 196 ft
- 4 main spans
- Daily traffic
- 13,021
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Brookville Road over Shadeland Avenue Nb/Sb is a concrete continuous stringer/multi-beam or girder carrying Brookville Road over Shadeland Avenue Nb/Sb in Marion County, Indiana. It was built in 1961 and reconstructed in 1988, so it is 64 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 13,021 vehicles a day, roughly 6% of them trucks, projected to reach 19,350 by 2039. The structure is 196 ft (59.8 m) long and 76 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Brookville Road over Shadeland Avenue Nb/Sb built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1988.
What condition is Brookville Road over Shadeland Avenue Nb/Sb in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.
How much traffic does Brookville Road over Shadeland Avenue Nb/Sb carry?
About 13,021 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is Brookville Road over Shadeland Avenue Nb/Sb?
The structure is 196 ft (59.8 m) long with a longest span of 57 ft (17.4 m) and a deck 76 ft wide.
Who owns Brookville Road over Shadeland Avenue Nb/Sb?
It is owned by the City or Municipal Highway Agency.