Emerson Avenue over Massachusetts Conrail
GoodMarion County, Indiana · 00.60 N I-70 · Structure no. 4900154
- Built
- 1969
- 56 years old, rebuilt 2012
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 361 ft
- 5 main spans
- Daily traffic
- 32,511
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Emerson Avenue over Massachusetts Conrail is a steel continuous stringer/multi-beam or girder carrying Emerson Avenue over Massachusetts Conrail in Marion County, Indiana. It was built in 1969 and reconstructed in 2012, so it is 56 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 32,511 vehicles a day, roughly 6% of them trucks, projected to reach 48,310 by 2039. The structure is 361 ft (110 m) long and 103 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Emerson Avenue over Massachusetts Conrail built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2012.
What condition is Emerson Avenue over Massachusetts Conrail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Emerson Avenue over Massachusetts Conrail carry?
About 32,511 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is Emerson Avenue over Massachusetts Conrail?
The structure is 361 ft (110 m) long with a longest span of 75 ft (23 m) and a deck 103 ft wide.
Who owns Emerson Avenue over Massachusetts Conrail?
It is owned by the City or Municipal Highway Agency.