US Bridges

I-65 SB & Cd over College Avenue

Good

Marion County, Indiana · 02.26 N I-70 · Structure no. 080908

Built
2023
2 years old
Condition
Good
inspected November 2023
Type
Tee Beam
Prestressed Concrete
Length
118 ft
1 main span
Daily traffic
26,775
2021 count
Owner
State
State Highway Agency

About this bridge

I-65 SB & Cd over College Avenue is a prestressed concrete tee beam carrying I-65 SB & Cd over College Avenue in Marion County, Indiana. It was built in 2023, so it is 2 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,775 vehicles a day, roughly 7% of them trucks, projected to reach 27,183 by 2041. The structure is 118 ft (35.9 m) long and 65 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-65 SB & Cd
CrossesCollege Avenue
Location02.26 N I-70
RouteInterstate 65
StateIndiana
Coordinates39.78313, -86.14473
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length118 ft (35.9 m)
Longest span116 ft (35.3 m)
Deck width65 ft (19.8 m)
Roadway width62 ft (18.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,775 (2021)
Projected traffic27,183 by 2041
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-65 SB & Cd over College Avenue built?

It was built in 2023, making it 2 years old in 2025.

What condition is I-65 SB & Cd over College Avenue in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does I-65 SB & Cd over College Avenue carry?

About 26,775 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is I-65 SB & Cd over College Avenue?

The structure is 118 ft (35.9 m) long with a longest span of 116 ft (35.3 m) and a deck 65 ft wide.

Who owns I-65 SB & Cd over College Avenue?

It is owned by the State Highway Agency.