US Bridges

I-70 EB Off Ramp over I-70 I-70 Cds

Good

Marion County, Indiana · 03.27 E SR 267 · Structure no. 041968

Built
2005
20 years old
Condition
Good
inspected October 2023
Type
Segmental Box Girder
Prestressed Concrete Continuous
Length
1,354 ft
7 main spans
Daily traffic
6,500
2005 count
Owner
State
State Highway Agency

About this bridge

I-70 EB Off Ramp over I-70 I-70 Cds is a prestressed concrete continuous segmental box girder carrying I-70 EB Off Ramp over I-70 I-70 Cds in Marion County, Indiana. It was built in 2005, so it is 20 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,500 vehicles a day, roughly 10% of them trucks, projected to reach 10,240 by 2032. The structure is 1,354 ft (412.6 m) long and 53 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesI-70 EB Off Ramp
CrossesI-70 I-70 Cds
Location03.27 E SR 267
RouteInterstate 70
StateIndiana
Coordinates39.69047, -86.31776
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.4 US tons
Inventory rating33.8 US tons

Structure

Structure typeSegmental Box Girder
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length1,354 ft (412.6 m)
Longest span220 ft (67 m)
Deck width53 ft (16.2 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,500 (2005)
Projected traffic10,240 by 2032
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-70 EB Off Ramp over I-70 I-70 Cds built?

It was built in 2005, making it 20 years old in 2025.

What condition is I-70 EB Off Ramp over I-70 I-70 Cds in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-70 EB Off Ramp over I-70 I-70 Cds carry?

About 6,500 vehicles per day (2005 count), of which roughly 10% are trucks.

How long is I-70 EB Off Ramp over I-70 I-70 Cds?

The structure is 1,354 ft (412.6 m) long with a longest span of 220 ft (67 m) and a deck 53 ft wide.

Who owns I-70 EB Off Ramp over I-70 I-70 Cds?

It is owned by the State Highway Agency.