US Bridges

Stop 11 Road over I-65 Nb/Sb

Good

Marion County, Indiana · 04.18 S I-465 · Structure no. 035930

Built
1971
54 years old, rebuilt 1990
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
209 ft
2 main spans
Daily traffic
3,225
2004 count
Owner
State
State Highway Agency

About this bridge

Stop 11 Road over I-65 Nb/Sb is a steel continuous stringer/multi-beam or girder carrying Stop 11 Road over I-65 Nb/Sb in Marion County, Indiana. It was built in 1971 and reconstructed in 1990, so it is 54 years old, older than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,225 vehicles a day, roughly 5% of them trucks, projected to reach 4,544 by 2030. The structure is 209 ft (63.6 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesStop 11 Road
CrossesI-65 Nb/Sb
Location04.18 S I-465
RouteCity Street 0
StateIndiana
Coordinates39.65131, -86.07428
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.7 US tons
Inventory rating42.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length209 ft (63.6 m)
Longest span103 ft (31.5 m)
Deck width39 ft (11.8 m)
Roadway width36 ft (10.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,225 (2004)
Projected traffic4,544 by 2030
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Stop 11 Road over I-65 Nb/Sb built?

It was built in 1971, making it 54 years old in 2025. It was reconstructed in 1990.

What condition is Stop 11 Road over I-65 Nb/Sb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Stop 11 Road over I-65 Nb/Sb carry?

About 3,225 vehicles per day (2004 count), of which roughly 5% are trucks.

How long is Stop 11 Road over I-65 Nb/Sb?

The structure is 209 ft (63.6 m) long with a longest span of 103 ft (31.5 m) and a deck 39 ft wide.

Who owns Stop 11 Road over I-65 Nb/Sb?

It is owned by the State Highway Agency.