8th ST over White River Trail
GoodMadison County, Indiana · 00.20 E Jackson ST · Structure no. 4800239
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 695 ft
- 6 main spans
- Daily traffic
- 16,558
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
8th ST over White River Trail is a prestressed concrete continuous stringer/multi-beam or girder carrying 8th ST over White River Trail in Madison County, Indiana. It was built in 2018, so it is 7 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,558 vehicles a day, roughly 6% of them trucks, projected to reach 23,447 by 2043. The structure is 695 ft (211.7 m) long and 76 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 8th ST over White River Trail built?
It was built in 2018, making it 7 years old in 2025.
What condition is 8th ST over White River Trail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does 8th ST over White River Trail carry?
About 16,558 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is 8th ST over White River Trail?
The structure is 695 ft (211.7 m) long with a longest span of 115 ft (35.2 m) and a deck 76 ft wide.
Who owns 8th ST over White River Trail?
It is owned by the County Highway Agency.