US Bridges

CR 200W over Ivan Moorman Drain

Good

Madison County, Indiana · 00.75 N SR 128 · Structure no. 4800217

Built
2008
17 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
36 ft
1 main span
Daily traffic
321
2023 count
Owner
County
County Highway Agency

About this bridge

CR 200W over Ivan Moorman Drain is a steel stringer/multi-beam or girder carrying CR 200W over Ivan Moorman Drain in Madison County, Indiana. It was built in 2008, so it is 17 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 321 vehicles a day, roughly 3% of them trucks, projected to reach 455 by 2043. The structure is 36 ft (10.9 m) long and 31 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesCR 200W
CrossesIvan Moorman Drain
Location00.75 N SR 128
RouteCounty Highway 61
StateIndiana
Coordinates40.22928, -85.70961
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating100 US tons
Inventory rating66.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length36 ft (10.9 m)
Longest span35 ft (10.6 m)
Deck width31 ft (9.6 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic321 (2023)
Projected traffic455 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 200W over Ivan Moorman Drain built?

It was built in 2008, making it 17 years old in 2025.

What condition is CR 200W over Ivan Moorman Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does CR 200W over Ivan Moorman Drain carry?

About 321 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is CR 200W over Ivan Moorman Drain?

The structure is 36 ft (10.9 m) long with a longest span of 35 ft (10.6 m) and a deck 31 ft wide.

Who owns CR 200W over Ivan Moorman Drain?

It is owned by the County Highway Agency.