Grangemouth DR over Stone-Lily Lake Channel
FairPosted for loadLaPorte County, Indiana · 00.01 NW Lake Shore DR · Structure no. 4600137
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected September 2024
- Type
- Slab
- Wood or Timber
- Length
- 48 ft
- 3 main spans
- Daily traffic
- 2,425
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Grangemouth DR over Stone-Lily Lake Channel is a wood or timber slab carrying Grangemouth DR over Stone-Lily Lake Channel in LaPorte County, Indiana. It was built in 1986, so it is 39 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,425 vehicles a day, roughly 5% of them trucks, projected to reach 3,025 by 2042. The structure is 48 ft (14.6 m) long and 25 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grangemouth DR over Stone-Lily Lake Channel built?
It was built in 1986, making it 39 years old in 2025.
What condition is Grangemouth DR over Stone-Lily Lake Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Grangemouth DR over Stone-Lily Lake Channel carry?
About 2,425 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Grangemouth DR over Stone-Lily Lake Channel?
The structure is 48 ft (14.6 m) long with a longest span of 16 ft (4.8 m) and a deck 25 ft wide.
Who owns Grangemouth DR over Stone-Lily Lake Channel?
It is owned by the County Highway Agency.