Columbia Ave over Conrail RR 3 Streets
FairLake County, Indiana · 00.10 S Michigan ST · Structure no. 4500156
- Built
- 1963
- 62 years old, rebuilt 2002
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 964 ft
- 11 main spans
- Daily traffic
- 17,931
- 2012 count
- Owner
- County
- County Highway Agency
About this bridge
Columbia Ave over Conrail RR 3 Streets is a steel continuous stringer/multi-beam or girder carrying Columbia Ave over Conrail RR 3 Streets in Lake County, Indiana. It was built in 1963 and reconstructed in 2002, so it is 62 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,931 vehicles a day, roughly 3% of them trucks, projected to reach 23,693 by 2040. The structure is 964 ft (293.7 m) long and 63 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Columbia Ave over Conrail RR 3 Streets built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2002.
What condition is Columbia Ave over Conrail RR 3 Streets in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Columbia Ave over Conrail RR 3 Streets carry?
About 17,931 vehicles per day (2012 count), of which roughly 3% are trucks.
How long is Columbia Ave over Conrail RR 3 Streets?
The structure is 964 ft (293.7 m) long with a longest span of 100 ft (30.4 m) and a deck 63 ft wide.
Who owns Columbia Ave over Conrail RR 3 Streets?
It is owned by the County Highway Agency.