SR 912 Ramp NW over Little Calumet River
FairLake County, Indiana · 00.22 E I-80 · Structure no. 033164
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected September 2024
- Type
- Tee Beam
- Prestressed Concrete Continuous
- Length
- 272 ft
- 3 main spans
- Daily traffic
- 6,652
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR 912 Ramp NW over Little Calumet River is a prestressed concrete continuous tee beam carrying SR 912 Ramp NW over Little Calumet River in Lake County, Indiana. It was built in 1999, so it is 26 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,652 vehicles a day, roughly 10% of them trucks, projected to reach 144 by 2030. The structure is 272 ft (82.9 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 912 Ramp NW over Little Calumet River built?
It was built in 1999, making it 26 years old in 2025.
What condition is SR 912 Ramp NW over Little Calumet River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SR 912 Ramp NW over Little Calumet River carry?
About 6,652 vehicles per day (2022 count), of which roughly 10% are trucks.
How long is SR 912 Ramp NW over Little Calumet River?
The structure is 272 ft (82.9 m) long with a longest span of 95 ft (29 m) and a deck 35 ft wide.
Who owns SR 912 Ramp NW over Little Calumet River?
It is owned by the State Highway Agency.