CR 100 Eweiland over I-90 Eb/Wb
FairLaGrange County, Indiana · 01.00 E SR 9 · Structure no. 048470
- Built
- 1956
- 69 years old, rebuilt 1996
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 219 ft
- 4 main spans
- Daily traffic
- 155
- 2015 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
CR 100 Eweiland over I-90 Eb/Wb is a steel stringer/multi-beam or girder carrying CR 100 Eweiland over I-90 Eb/Wb in LaGrange County, Indiana. It was built in 1956 and reconstructed in 1996, so it is 69 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 155 vehicles a day, roughly 10% of them trucks, projected to reach 963 by 2031. The structure is 219 ft (66.7 m) long and 30 ft wide. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 100 Eweiland over I-90 Eb/Wb built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1996.
What condition is CR 100 Eweiland over I-90 Eb/Wb in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does CR 100 Eweiland over I-90 Eb/Wb carry?
About 155 vehicles per day (2015 count), of which roughly 10% are trucks.
How long is CR 100 Eweiland over I-90 Eb/Wb?
The structure is 219 ft (66.7 m) long with a longest span of 65 ft (19.9 m) and a deck 30 ft wide.
Who owns CR 100 Eweiland over I-90 Eb/Wb?
It is owned by the State Toll Authority.