Division Road over Salamonie River
GoodJay County, Indiana · 0.7 Miles West of SR 26 · Structure no. 3800087
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 137 ft
- 3 main spans
- Daily traffic
- 74
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Division Road over Salamonie River is a prestressed concrete continuous box beam or girders - single or spread carrying Division Road over Salamonie River in Jay County, Indiana. It was built in 1998, so it is 27 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 74 vehicles a day, projected to reach 91 by 2039. The structure is 137 ft (41.8 m) long and 24 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Division Road over Salamonie River built?
It was built in 1998, making it 27 years old in 2025.
What condition is Division Road over Salamonie River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Division Road over Salamonie River carry?
About 74 vehicles per day (2019 count).
How long is Division Road over Salamonie River?
The structure is 137 ft (41.8 m) long with a longest span of 45 ft (13.8 m) and a deck 24 ft wide.
Who owns Division Road over Salamonie River?
It is owned by the County Highway Agency.