US Bridges

SR 67 over Halfway Creek

Good

Jay County, Indiana · 02.42 S SR 1 · Structure no. 024280

Built
1993
32 years old
Condition
Good
inspected October 2024
Type
Slab
Concrete Continuous
Length
83 ft
3 main spans
Daily traffic
4,750
2021 count
Owner
State
State Highway Agency

About this bridge

SR 67 over Halfway Creek is a concrete continuous slab carrying SR 67 over Halfway Creek in Jay County, Indiana. It was built in 1993, so it is 32 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,750 vehicles a day, roughly 15% of them trucks, projected to reach 6,300 by 2035. The structure is 83 ft (25.2 m) long and 48 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesSR 67
CrossesHalfway Creek
Location02.42 S SR 1
RouteState Highway 67
StateIndiana
Coordinates40.33194, -85.18052
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38.9 US tons
Inventory rating30 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length83 ft (25.2 m)
Longest span32 ft (9.7 m)
Deck width48 ft (14.7 m)
Roadway width45 ft (13.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,750 (2021)
Projected traffic6,300 by 2035
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 67 over Halfway Creek built?

It was built in 1993, making it 32 years old in 2025.

What condition is SR 67 over Halfway Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does SR 67 over Halfway Creek carry?

About 4,750 vehicles per day (2021 count), of which roughly 15% are trucks.

How long is SR 67 over Halfway Creek?

The structure is 83 ft (25.2 m) long with a longest span of 32 ft (9.7 m) and a deck 48 ft wide.

Who owns SR 67 over Halfway Creek?

It is owned by the State Highway Agency.