CR 75 East over Branch of Oliver Ditch
FairJasper County, Indiana · 0.90 Miles N of CR 225 N · Structure no. 3700087
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 34 ft
- 1 main span
- Daily traffic
- 236
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
CR 75 East over Branch of Oliver Ditch is a prestressed concrete box beam or girders - multiple carrying CR 75 East over Branch of Oliver Ditch in Jasper County, Indiana. It was built in 2005, so it is 20 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 236 vehicles a day, roughly 5% of them trucks, projected to reach 337 by 2042. The structure is 34 ft (10.3 m) long and 26 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 75 East over Branch of Oliver Ditch built?
It was built in 2005, making it 20 years old in 2025.
What condition is CR 75 East over Branch of Oliver Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does CR 75 East over Branch of Oliver Ditch carry?
About 236 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is CR 75 East over Branch of Oliver Ditch?
The structure is 34 ft (10.3 m) long with a longest span of 30 ft (9.2 m) and a deck 26 ft wide.
Who owns CR 75 East over Branch of Oliver Ditch?
It is owned by the County Highway Agency.