US Bridges

SR 3 over Wabash River (new Chan.)

Good

Huntington County, Indiana · 00.39 S of SR 116 · Structure no. 001260

Built
1963
62 years old, rebuilt 2015
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
517 ft
7 main spans
Daily traffic
3,930
2019 count
Owner
State
State Highway Agency

About this bridge

SR 3 over Wabash River (new Chan.) is a steel continuous stringer/multi-beam or girder carrying SR 3 over Wabash River (new Chan.) in Huntington County, Indiana. It was built in 1963 and reconstructed in 2015, so it is 62 years old, older than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,930 vehicles a day, roughly 19% of them trucks, projected to reach 2,280 by 2035. The structure is 517 ft (157.7 m) long and 35 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesSR 3
CrossesWabash River (new Chan.)
Location00.39 S of SR 116
RouteState Highway 3
StateIndiana
Coordinates40.81963, -85.34235
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating38.9 US tons
Inventory rating30 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length517 ft (157.7 m)
Longest span77 ft (23.4 m)
Deck width35 ft (10.8 m)
Roadway width33 ft (10.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,930 (2019)
Projected traffic2,280 by 2035
Trucks19%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 3 over Wabash River (new Chan.) built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2015.

What condition is SR 3 over Wabash River (new Chan.) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does SR 3 over Wabash River (new Chan.) carry?

About 3,930 vehicles per day (2019 count), of which roughly 19% are trucks.

How long is SR 3 over Wabash River (new Chan.)?

The structure is 517 ft (157.7 m) long with a longest span of 77 ft (23.4 m) and a deck 35 ft wide.

Who owns SR 3 over Wabash River (new Chan.)?

It is owned by the State Highway Agency.