E Columbia ST over W Fork of White Lick CR
FairHendricks County, Indiana · 00.20 S of CR 50 N · Structure no. 3200121
- Built
- 1963
- 62 years old, rebuilt 2013
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 92 ft
- 3 main spans
- Daily traffic
- 850
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
E Columbia ST over W Fork of White Lick CR is a prestressed concrete stringer/multi-beam or girder carrying E Columbia ST over W Fork of White Lick CR in Hendricks County, Indiana. It was built in 1963 and reconstructed in 2013, so it is 62 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 850 vehicles a day, roughly 6% of them trucks, projected to reach 1,475 by 2038. The structure is 92 ft (28 m) long and 33 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E Columbia ST over W Fork of White Lick CR built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2013.
What condition is E Columbia ST over W Fork of White Lick CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does E Columbia ST over W Fork of White Lick CR carry?
About 850 vehicles per day (2018 count), of which roughly 6% are trucks.
How long is E Columbia ST over W Fork of White Lick CR?
The structure is 92 ft (28 m) long with a longest span of 30 ft (9.1 m) and a deck 33 ft wide.
Who owns E Columbia ST over W Fork of White Lick CR?
It is owned by the County Highway Agency.