I-70 EB Cd over East Fork White Lick CR
GoodHendricks County, Indiana · 02.27 E SR 267 · Structure no. 041942
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 112 ft
- 3 main spans
- Daily traffic
- 5,000
- 2005 count
- Owner
- State
- State Highway Agency
About this bridge
I-70 EB Cd over East Fork White Lick CR is a prestressed concrete continuous stringer/multi-beam or girder carrying I-70 EB Cd over East Fork White Lick CR in Hendricks County, Indiana. It was built in 2005, so it is 20 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 10% of them trucks, projected to reach 7,400 by 2030. The structure is 112 ft (34.1 m) long and 45 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-70 EB Cd over East Fork White Lick CR built?
It was built in 2005, making it 20 years old in 2025.
What condition is I-70 EB Cd over East Fork White Lick CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does I-70 EB Cd over East Fork White Lick CR carry?
About 5,000 vehicles per day (2005 count), of which roughly 10% are trucks.
How long is I-70 EB Cd over East Fork White Lick CR?
The structure is 112 ft (34.1 m) long with a longest span of 45 ft (13.8 m) and a deck 45 ft wide.
Who owns I-70 EB Cd over East Fork White Lick CR?
It is owned by the State Highway Agency.