US Bridges

US 36 WB over White Lick Creek Trail

Good

Hendricks County, Indiana · 00.96 W SR 267 · Structure no. 011661

Built
2021
4 years old
Condition
Good
inspected January 2024
Type
Tee Beam
Prestressed Concrete Continuous
Length
243 ft
2 main spans
Daily traffic
16,100
2021 count
Owner
State
State Highway Agency

About this bridge

US 36 WB over White Lick Creek Trail is a prestressed concrete continuous tee beam carrying US 36 WB over White Lick Creek Trail in Hendricks County, Indiana. It was built in 2021, so it is 4 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,100 vehicles a day, roughly 4% of them trucks, projected to reach 20,100 by 2034. The structure is 243 ft (74 m) long and 42 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS 36 WB
CrossesWhite Lick Creek Trail
Location00.96 W SR 267
RouteU.S. Route 36
StateIndiana
Coordinates39.76247, -86.41737
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.4 US tons
Inventory rating44.3 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length243 ft (74 m)
Longest span120 ft (36.5 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,100 (2021)
Projected traffic20,100 by 2034
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 36 WB over White Lick Creek Trail built?

It was built in 2021, making it 4 years old in 2025.

What condition is US 36 WB over White Lick Creek Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does US 36 WB over White Lick Creek Trail carry?

About 16,100 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is US 36 WB over White Lick Creek Trail?

The structure is 243 ft (74 m) long with a longest span of 120 ft (36.5 m) and a deck 42 ft wide.

Who owns US 36 WB over White Lick Creek Trail?

It is owned by the State Highway Agency.