CR 100SDAVIS Road over Brandywine Creek
GoodHancock County, Indiana · 00.38 W of S Morristown P · Structure no. 3000460
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected June 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 160 ft
- 3 main spans
- Daily traffic
- 1,110
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
CR 100SDAVIS Road over Brandywine Creek is a prestressed concrete continuous box beam or girders - single or spread carrying CR 100SDAVIS Road over Brandywine Creek in Hancock County, Indiana. It was built in 1996, so it is 29 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,110 vehicles a day, roughly 3% of them trucks, projected to reach 2,000 by 2042. The structure is 160 ft (48.7 m) long and 41 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 100SDAVIS Road over Brandywine Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is CR 100SDAVIS Road over Brandywine Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does CR 100SDAVIS Road over Brandywine Creek carry?
About 1,110 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is CR 100SDAVIS Road over Brandywine Creek?
The structure is 160 ft (48.7 m) long with a longest span of 57 ft (17.3 m) and a deck 41 ft wide.
Who owns CR 100SDAVIS Road over Brandywine Creek?
It is owned by the City or Municipal Highway Agency and maintained by the County Highway Agency.