US Bridges

Keystone Parkway N over E 96th ST Eb/Wb

Good

Hamilton County, Indiana · 00.38 N of I-465 · Structure no. 2900498

Built
2019
6 years old
Condition
Good
inspected September 2023
Type
Tee Beam
Prestressed Concrete Continuous
Length
221 ft
2 main spans
Daily traffic
67,590
2024 count
Owner
County
County Highway Agency

About this bridge

Keystone Parkway N over E 96th ST Eb/Wb is a prestressed concrete continuous tee beam carrying Keystone Parkway N over E 96th ST Eb/Wb in Hamilton County, Indiana. It was built in 2019, so it is 6 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 67,590 vehicles a day, roughly 3% of them trucks, projected to reach 121,660 by 2044. The structure is 221 ft (67.5 m) long and 119 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesKeystone Parkway N
CrossesE 96th ST Eb/Wb
Location00.38 N of I-465
RouteCity Street 0
StateIndiana
Coordinates39.92694, -86.1123
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating38.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length221 ft (67.5 m)
Longest span120 ft (36.5 m)
Deck width119 ft (36.3 m)
Roadway width119 ft (36.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic67,590 (2024)
Projected traffic121,660 by 2044
Trucks3%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Keystone Parkway N over E 96th ST Eb/Wb built?

It was built in 2019, making it 6 years old in 2025.

What condition is Keystone Parkway N over E 96th ST Eb/Wb in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Keystone Parkway N over E 96th ST Eb/Wb carry?

About 67,590 vehicles per day (2024 count), of which roughly 3% are trucks.

How long is Keystone Parkway N over E 96th ST Eb/Wb?

The structure is 221 ft (67.5 m) long with a longest span of 120 ft (36.5 m) and a deck 119 ft wide.

Who owns Keystone Parkway N over E 96th ST Eb/Wb?

It is owned by the County Highway Agency.