US Bridges

106th ST East over Cheeney Creek

Good

Hamilton County, Indiana · 00.09 E of Allisonville R · Structure no. 2900479

Built
2016
9 years old
Condition
Good
inspected August 2023
Type
Slab
Concrete
Length
38 ft
1 main span
Daily traffic
10,950
2022 count
Owner
County
County Highway Agency

About this bridge

106th ST East over Cheeney Creek is a concrete slab carrying 106th ST East over Cheeney Creek in Hamilton County, Indiana. It was built in 2016, so it is 9 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,950 vehicles a day, roughly 8% of them trucks, projected to reach 17,790 by 2042. The structure is 38 ft (11.6 m) long and 55 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries106th ST East
CrossesCheeney Creek
Location00.09 E of Allisonville R
RouteCity Street 0
StateIndiana
Coordinates39.9416, -86.04729
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating30.3 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length38 ft (11.6 m)
Longest span33 ft (10 m)
Deck width55 ft (16.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,950 (2022)
Projected traffic17,790 by 2042
Trucks8%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 106th ST East over Cheeney Creek built?

It was built in 2016, making it 9 years old in 2025.

What condition is 106th ST East over Cheeney Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does 106th ST East over Cheeney Creek carry?

About 10,950 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is 106th ST East over Cheeney Creek?

The structure is 38 ft (11.6 m) long with a longest span of 33 ft (10 m) and a deck 55 ft wide.

Who owns 106th ST East over Cheeney Creek?

It is owned by the County Highway Agency.