US Bridges

W Main ST over Williams Creek

Good

Hamilton County, Indiana · 00.20 W of Springmill RD · Structure no. 2900444

Built
2008
17 years old
Condition
Good
inspected August 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
62 ft
1 main span
Daily traffic
11,050
2024 count
Owner
County
County Highway Agency

About this bridge

W Main ST over Williams Creek is a prestressed concrete box beam or girders - multiple carrying W Main ST over Williams Creek in Hamilton County, Indiana. It was built in 2008, so it is 17 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,050 vehicles a day, roughly 4% of them trucks, projected to reach 19,890 by 2044. The structure is 62 ft (18.9 m) long and 74 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesW Main ST
CrossesWilliams Creek
Location00.20 W of Springmill RD
RouteCity Street 0
StateIndiana
Coordinates39.97774, -86.16844
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.7 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length62 ft (18.9 m)
Longest span60 ft (18.2 m)
Deck width74 ft (22.7 m)
Roadway width38 ft (11.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,050 (2024)
Projected traffic19,890 by 2044
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was W Main ST over Williams Creek built?

It was built in 2008, making it 17 years old in 2025.

What condition is W Main ST over Williams Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does W Main ST over Williams Creek carry?

About 11,050 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is W Main ST over Williams Creek?

The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.2 m) and a deck 74 ft wide.

Who owns W Main ST over Williams Creek?

It is owned by the County Highway Agency.