W Main ST over Williams Creek
GoodHamilton County, Indiana · 00.20 W of Springmill RD · Structure no. 2900444
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 11,050
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
W Main ST over Williams Creek is a prestressed concrete box beam or girders - multiple carrying W Main ST over Williams Creek in Hamilton County, Indiana. It was built in 2008, so it is 17 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,050 vehicles a day, roughly 4% of them trucks, projected to reach 19,890 by 2044. The structure is 62 ft (18.9 m) long and 74 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was W Main ST over Williams Creek built?
It was built in 2008, making it 17 years old in 2025.
What condition is W Main ST over Williams Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does W Main ST over Williams Creek carry?
About 11,050 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is W Main ST over Williams Creek?
The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.2 m) and a deck 74 ft wide.
Who owns W Main ST over Williams Creek?
It is owned by the County Highway Agency.