SR 431 NB over Cool Creek & Trail
GoodHamilton County, Indiana · 0.44 S 146th ST · Structure no. 080462
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected September 2024
- Type
- Tee Beam
- Prestressed Concrete Continuous
- Length
- 159 ft
- 3 main spans
- Daily traffic
- 11,596
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
SR 431 NB over Cool Creek & Trail is a prestressed concrete continuous tee beam carrying SR 431 NB over Cool Creek & Trail in Hamilton County, Indiana. It was built in 2012, so it is 13 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,596 vehicles a day, roughly 4% of them trucks, projected to reach 15,000 by 2041. The structure is 159 ft (48.4 m) long and 34 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 431 NB over Cool Creek & Trail built?
It was built in 2012, making it 13 years old in 2025.
What condition is SR 431 NB over Cool Creek & Trail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does SR 431 NB over Cool Creek & Trail carry?
About 11,596 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is SR 431 NB over Cool Creek & Trail?
The structure is 159 ft (48.4 m) long with a longest span of 62 ft (18.8 m) and a deck 34 ft wide.
Who owns SR 431 NB over Cool Creek & Trail?
It is owned by the State Highway Agency.