CR 700 North over Sloan Ditch
FairPosted for loadGreene County, Indiana · 0.80 E of CR 350 W · Structure no. 2800054
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 50 ft
- 1 main span
- Daily traffic
- 36
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
CR 700 North over Sloan Ditch is a prestressed concrete box beam or girders - multiple carrying CR 700 North over Sloan Ditch in Greene County, Indiana. It was built in 1969, so it is 56 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 36 vehicles a day, roughly 8% of them trucks, projected to reach 46 by 2042. The structure is 50 ft (15.3 m) long and 18 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 700 North over Sloan Ditch built?
It was built in 1969, making it 56 years old in 2025.
What condition is CR 700 North over Sloan Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does CR 700 North over Sloan Ditch carry?
About 36 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is CR 700 North over Sloan Ditch?
The structure is 50 ft (15.3 m) long with a longest span of 47 ft (14.4 m) and a deck 18 ft wide.
Who owns CR 700 North over Sloan Ditch?
It is owned by the County Highway Agency.