US Bridges

I-69 SB over CR 75 E

Good

Greene County, Indiana · 00.28 S US 231 · Structure no. 080360

Built
2011
14 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
61 ft
1 main span
Daily traffic
3,415
2016 count
Owner
State
State Highway Agency

About this bridge

I-69 SB over CR 75 E is a prestressed concrete stringer/multi-beam or girder carrying I-69 SB over CR 75 E in Greene County, Indiana. It was built in 2011, so it is 14 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,415 vehicles a day, roughly 25% of them trucks, projected to reach 9,605 by 2030. The structure is 61 ft (18.5 m) long and 65 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-69 SB
CrossesCR 75 E
Location00.28 S US 231
RouteInterstate 69
StateIndiana
Coordinates38.9161, -86.9271
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.3 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length61 ft (18.5 m)
Longest span55 ft (16.7 m)
Deck width65 ft (19.8 m)
Roadway width62 ft (18.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,415 (2016)
Projected traffic9,605 by 2030
Trucks25%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-69 SB over CR 75 E built?

It was built in 2011, making it 14 years old in 2025.

What condition is I-69 SB over CR 75 E in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does I-69 SB over CR 75 E carry?

About 3,415 vehicles per day (2016 count), of which roughly 25% are trucks.

How long is I-69 SB over CR 75 E?

The structure is 61 ft (18.5 m) long with a longest span of 55 ft (16.7 m) and a deck 65 ft wide.

Who owns I-69 SB over CR 75 E?

It is owned by the State Highway Agency.