I-69 SB over CR 360 S Plummer Creek
GoodGreene County, Indiana · 03.40 NW SR 45 · Structure no. 060622
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected October 2023
- Type
- Tee Beam
- Prestressed Concrete Continuous
- Length
- 749 ft
- 5 main spans
- Daily traffic
- 2,610
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
I-69 SB over CR 360 S Plummer Creek is a prestressed concrete continuous tee beam carrying I-69 SB over CR 360 S Plummer Creek in Greene County, Indiana. It was built in 2015, so it is 10 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,610 vehicles a day, roughly 23% of them trucks, projected to reach 23,624 by 2030. The structure is 749 ft (228.3 m) long and 43 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-69 SB over CR 360 S Plummer Creek built?
It was built in 2015, making it 10 years old in 2025.
What condition is I-69 SB over CR 360 S Plummer Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does I-69 SB over CR 360 S Plummer Creek carry?
About 2,610 vehicles per day (2012 count), of which roughly 23% are trucks.
How long is I-69 SB over CR 360 S Plummer Creek?
The structure is 749 ft (228.3 m) long with a longest span of 150 ft (45.6 m) and a deck 43 ft wide.
Who owns I-69 SB over CR 360 S Plummer Creek?
It is owned by the State Highway Agency.