US Bridges

2nd ST over Back Creek

Good

Grant County, Indiana · 00.14 MI W of Main ST · Structure no. 2700149

Built
2003
22 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
41 ft
1 main span
Daily traffic
470
2021 count
Owner
County
County Highway Agency

About this bridge

2nd ST over Back Creek is a prestressed concrete box beam or girders - multiple carrying 2nd ST over Back Creek in Grant County, Indiana. It was built in 2003, so it is 22 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 470 vehicles a day, roughly 5% of them trucks, projected to reach 720 by 2041. The structure is 41 ft (12.4 m) long and 28 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

Carries2nd ST
CrossesBack Creek
Location00.14 MI W of Main ST
RouteCity Street 0
StateIndiana
Coordinates40.41732, -85.65305
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.7 US tons
Inventory rating43 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length41 ft (12.4 m)
Longest span38 ft (11.7 m)
Deck width28 ft (8.6 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic470 (2021)
Projected traffic720 by 2041
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was 2nd ST over Back Creek built?

It was built in 2003, making it 22 years old in 2025.

What condition is 2nd ST over Back Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does 2nd ST over Back Creek carry?

About 470 vehicles per day (2021 count), of which roughly 5% are trucks.

How long is 2nd ST over Back Creek?

The structure is 41 ft (12.4 m) long with a longest span of 38 ft (11.7 m) and a deck 28 ft wide.

Who owns 2nd ST over Back Creek?

It is owned by the County Highway Agency.