Division Line RD over Grant-Howard Ditch
GoodGrant County, Indiana · 01.96 MI W of SR 13 · Structure no. 2700143
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 630
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Division Line RD over Grant-Howard Ditch is a prestressed concrete box beam or girders - multiple carrying Division Line RD over Grant-Howard Ditch in Grant County, Indiana. It was built in 2002, so it is 23 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 630 vehicles a day, roughly 5% of them trucks, projected to reach 960 by 2041. The structure is 30 ft (9.1 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Division Line RD over Grant-Howard Ditch built?
It was built in 2002, making it 23 years old in 2025.
What condition is Division Line RD over Grant-Howard Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Division Line RD over Grant-Howard Ditch carry?
About 630 vehicles per day (2021 count), of which roughly 5% are trucks.
How long is Division Line RD over Grant-Howard Ditch?
The structure is 30 ft (9.1 m) long with a longest span of 28 ft (8.5 m) and a deck 24 ft wide.
Who owns Division Line RD over Grant-Howard Ditch?
It is owned by the County Highway Agency.