US Bridges

S West ST over Richland Creek

FairPosted for load

Gibson County, Indiana · 0.1 MI N of Clark ST · Structure no. 2600369

Built
1959
66 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
29 ft
1 main span
Daily traffic
5
2023 count
Owner
County
County Highway Agency

About this bridge

S West ST over Richland Creek is a steel stringer/multi-beam or girder carrying S West ST over Richland Creek in Gibson County, Indiana. It was built in 1959, so it is 66 years old, older than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 5 vehicles a day, projected to reach 10 by 2043. The structure is 29 ft (8.9 m) long and 21 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesS West ST
CrossesRichland Creek
Location0.1 MI N of Clark ST
RouteCity Street 0
StateIndiana
Coordinates38.35344, -87.57008
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36.2 US tons
Inventory rating21.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length29 ft (8.9 m)
Longest span22 ft (6.6 m)
Deck width21 ft (6.4 m)
Roadway width21 ft (6.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5 (2023)
Projected traffic10 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$669,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was S West ST over Richland Creek built?

It was built in 1959, making it 66 years old in 2025.

What condition is S West ST over Richland Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does S West ST over Richland Creek carry?

About 5 vehicles per day (2023 count).

How long is S West ST over Richland Creek?

The structure is 29 ft (8.9 m) long with a longest span of 22 ft (6.6 m) and a deck 21 ft wide.

Who owns S West ST over Richland Creek?

It is owned by the County Highway Agency.