CR 400N over Turkey Run
FairFountain County, Indiana · 00.30 E of CR 225 E · Structure no. 2300083
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected June 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete Continuous
- Length
- 71 ft
- 3 main spans
- Daily traffic
- 117
- 2012 count
- Owner
- County
- County Highway Agency
About this bridge
CR 400N over Turkey Run is a prestressed concrete continuous box beam or girders - multiple carrying CR 400N over Turkey Run in Fountain County, Indiana. It was built in 1974, so it is 51 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 117 vehicles a day, roughly 6% of them trucks, projected to reach 158 by 2032. The structure is 71 ft (21.7 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 400N over Turkey Run built?
It was built in 1974, making it 51 years old in 2025.
What condition is CR 400N over Turkey Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does CR 400N over Turkey Run carry?
About 117 vehicles per day (2012 count), of which roughly 6% are trucks.
How long is CR 400N over Turkey Run?
The structure is 71 ft (21.7 m) long with a longest span of 30 ft (9.2 m) and a deck 24 ft wide.
Who owns CR 400N over Turkey Run?
It is owned by the County Highway Agency.