US Bridges

Innovation Parkway over Georgetown Creek Overflo

Good

Floyd County, Indiana · 00.22 S of US 64 · Structure no. 2200118

Built
2023
2 years old
Condition
Good
inspected March 2024
Type
Culvert
Aluminum, Wrought Iron, or Cast Iron
Length
23 ft
1 main span
Daily traffic
100
2023 count
Owner
County
County Highway Agency

About this bridge

Innovation Parkway over Georgetown Creek Overflo is a aluminum, wrought iron, or cast iron culvert carrying Innovation Parkway over Georgetown Creek Overflo in Floyd County, Indiana. It was built in 2023, so it is 2 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 140 by 2043. The structure is 23 ft (7 m) long and 43 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesInnovation Parkway
CrossesGeorgetown Creek Overflo
Location00.22 S of US 64
RouteCity Street 0
StateIndiana
Coordinates38.2878, -85.93496
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating110.1 US tons

Structure

Structure typeCulvert
MaterialAluminum, Wrought Iron, or Cast Iron
DeckNot applicable
Main spans1
Design loadUnknown
Structure length23 ft (7 m)
Longest span23 ft (7 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2023)
Projected traffic140 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Innovation Parkway over Georgetown Creek Overflo built?

It was built in 2023, making it 2 years old in 2025.

What condition is Innovation Parkway over Georgetown Creek Overflo in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Innovation Parkway over Georgetown Creek Overflo carry?

About 100 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Innovation Parkway over Georgetown Creek Overflo?

The structure is 23 ft (7 m) long with a longest span of 23 ft (7 m) and a deck 43 ft wide.

Who owns Innovation Parkway over Georgetown Creek Overflo?

It is owned by the County Highway Agency.