US Bridges

Hartman ST over Berlin Court Ditch

Poor

Elkhart County, Indiana · 00.40 N US 6 · Structure no. 2000102

Built
1965
60 years old
Condition
Poor
inspected August 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
1,001
2020 count
Owner
County
County Highway Agency

About this bridge

Hartman ST over Berlin Court Ditch is a prestressed concrete box beam or girders - multiple carrying Hartman ST over Berlin Court Ditch in Elkhart County, Indiana. It was built in 1965, so it is 60 years old, older than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 1,001 vehicles a day, roughly 9% of them trucks, projected to reach 1,724 by 2040. The structure is 50 ft (15.2 m) long and 36 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesHartman ST
CrossesBerlin Court Ditch
Location00.40 N US 6
RouteCity Street 0
StateIndiana
Coordinates41.44934, -85.99738
Functional classUrban Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.3 US tons
Inventory rating33.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length50 ft (15.2 m)
Longest span46 ft (14 m)
Deck width36 ft (11.1 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,001 (2020)
Projected traffic1,724 by 2040
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$1.5 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Hartman ST over Berlin Court Ditch built?

It was built in 1965, making it 60 years old in 2025.

What condition is Hartman ST over Berlin Court Ditch in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.

How much traffic does Hartman ST over Berlin Court Ditch carry?

About 1,001 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is Hartman ST over Berlin Court Ditch?

The structure is 50 ft (15.2 m) long with a longest span of 46 ft (14 m) and a deck 36 ft wide.

Who owns Hartman ST over Berlin Court Ditch?

It is owned by the County Highway Agency.