Division ST over ST Joseph River
GoodElkhart County, Indiana · 00.10 N SR 120 · Structure no. 2000007
- Built
- 1970
- 55 years old, rebuilt 2005
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 330 ft
- 5 main spans
- Daily traffic
- 7,436
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Division ST over ST Joseph River is a prestressed concrete continuous stringer/multi-beam or girder carrying Division ST over ST Joseph River in Elkhart County, Indiana. It was built in 1970 and reconstructed in 2005, so it is 55 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,436 vehicles a day, roughly 10% of them trucks, projected to reach 12,808 by 2039. The structure is 330 ft (100.5 m) long and 42 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Division ST over ST Joseph River built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2005.
What condition is Division ST over ST Joseph River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does Division ST over ST Joseph River carry?
About 7,436 vehicles per day (2019 count), of which roughly 10% are trucks.
How long is Division ST over ST Joseph River?
The structure is 330 ft (100.5 m) long with a longest span of 66 ft (20.1 m) and a deck 42 ft wide.
Who owns Division ST over ST Joseph River?
It is owned by the County Highway Agency.