US Bridges

SR 28 over Stapleton Ditch

Fair

Delaware County, Indiana · 00.67 W I-69 · Structure no. 007795

Built
1994
31 years old
Condition
Fair
inspected February 2023
Type
Culvert
Concrete
Length
26 ft
2 main spans
Daily traffic
4,783
2021 count
Owner
State
State Highway Agency

About this bridge

SR 28 over Stapleton Ditch is a concrete culvert carrying SR 28 over Stapleton Ditch in Delaware County, Indiana. It was built in 1994, so it is 31 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,783 vehicles a day, roughly 20% of them trucks, projected to reach 6,218 by 2041. The structure is 26 ft (8 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSR 28
CrossesStapleton Ditch
Location00.67 W I-69
RouteState Highway 28
StateIndiana
Coordinates40.27715, -85.57142
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.1 US tons
Inventory rating35.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length26 ft (8 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,783 (2021)
Projected traffic6,218 by 2041
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 28 over Stapleton Ditch built?

It was built in 1994, making it 31 years old in 2025.

What condition is SR 28 over Stapleton Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does SR 28 over Stapleton Ditch carry?

About 4,783 vehicles per day (2021 count), of which roughly 20% are trucks.

How long is SR 28 over Stapleton Ditch?

The structure is 26 ft (8 m) long with a longest span of 12 ft (3.7 m).

Who owns SR 28 over Stapleton Ditch?

It is owned by the State Highway Agency.