US Bridges

CR 900 E over Stokers Ditch

Good

Clinton County, Indiana · 00.30 N of SR 38 · Structure no. 1200100

Built
1990
35 years old
Condition
Good
inspected May 2022
Type
Slab
Concrete Continuous
Length
61 ft
3 main spans
Daily traffic
102
2014 count
Owner
County
County Highway Agency

About this bridge

CR 900 E over Stokers Ditch is a concrete continuous slab carrying CR 900 E over Stokers Ditch in Clinton County, Indiana. It was built in 1990, so it is 35 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 102 vehicles a day, roughly 4% of them trucks, projected to reach 123 by 2034. The structure is 61 ft (18.5 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCR 900 E
CrossesStokers Ditch
Location00.30 N of SR 38
RouteCounty Highway 75
StateIndiana
Coordinates40.19156, -86.3376
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.4 US tons
Inventory rating40.3 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length61 ft (18.5 m)
Longest span24 ft (7.3 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic102 (2014)
Projected traffic123 by 2034
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 900 E over Stokers Ditch built?

It was built in 1990, making it 35 years old in 2025.

What condition is CR 900 E over Stokers Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does CR 900 E over Stokers Ditch carry?

About 102 vehicles per day (2014 count), of which roughly 4% are trucks.

How long is CR 900 E over Stokers Ditch?

The structure is 61 ft (18.5 m) long with a longest span of 24 ft (7.3 m) and a deck 24 ft wide.

Who owns CR 900 E over Stokers Ditch?

It is owned by the County Highway Agency.