I-65 NB over SR 311X
GoodClark County, Indiana · 01.74 N SR 60 · Structure no. 034740
- Built
- 1958
- 67 years old, rebuilt 2017
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete Continuous
- Length
- 198 ft
- 4 main spans
- Daily traffic
- 27,144
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
I-65 NB over SR 311X is a prestressed concrete continuous box beam or girders - single or spread carrying I-65 NB over SR 311X in Clark County, Indiana. It was built in 1958 and reconstructed in 2017, so it is 67 years old, older than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 27,144 vehicles a day, roughly 30% of them trucks, projected to reach 34,742 by 2035. The structure is 198 ft (60.2 m) long and 70 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-65 NB over SR 311X built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2017.
What condition is I-65 NB over SR 311X in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does I-65 NB over SR 311X carry?
About 27,144 vehicles per day (2015 count), of which roughly 30% are trucks.
How long is I-65 NB over SR 311X?
The structure is 198 ft (60.2 m) long with a longest span of 55 ft (16.7 m) and a deck 70 ft wide.
Who owns I-65 NB over SR 311X?
It is owned by the State Highway Agency.