US Bridges

CR 325W over SR 25/NSRR

Good

Cass County, Indiana · 03.24 S SR 29 · Structure no. 080568

Built
2013
12 years old
Condition
Good
inspected April 2023
Type
Tee Beam
Prestressed Concrete Continuous
Length
407 ft
3 main spans
Daily traffic
220
2010 count
Owner
State
State Highway Agency

About this bridge

CR 325W over SR 25/NSRR is a prestressed concrete continuous tee beam carrying CR 325W over SR 25/NSRR in Cass County, Indiana. It was built in 2013, so it is 12 years old, younger than the Indiana average of 46.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 220 vehicles a day, roughly 16% of them trucks, projected to reach 260 by 2030. The structure is 407 ft (124.2 m) long and 33 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesCR 325W
CrossesSR 25/NSRR
Location03.24 S SR 29
RouteCounty Highway 0
StateIndiana
Coordinates40.71511, -86.43444
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.5 US tons
Inventory rating43.5 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length407 ft (124.2 m)
Longest span157 ft (47.8 m)
Deck width33 ft (10 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic220 (2010)
Projected traffic260 by 2030
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was CR 325W over SR 25/NSRR built?

It was built in 2013, making it 12 years old in 2025.

What condition is CR 325W over SR 25/NSRR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does CR 325W over SR 25/NSRR carry?

About 220 vehicles per day (2010 count), of which roughly 16% are trucks.

How long is CR 325W over SR 25/NSRR?

The structure is 407 ft (124.2 m) long with a longest span of 157 ft (47.8 m) and a deck 33 ft wide.

Who owns CR 325W over SR 25/NSRR?

It is owned by the State Highway Agency.