Christiansburg Roa over Middle Fork Salt Creek
GoodBrown County, Indiana · 0.1 MI S of Bellsville Pk · Structure no. 0700020
- Built
- 1994
- 31 years old
- Condition
- Good
- inspected October 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 142 ft
- 3 main spans
- Daily traffic
- 400
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Christiansburg Roa over Middle Fork Salt Creek is a prestressed concrete box beam or girders - single or spread carrying Christiansburg Roa over Middle Fork Salt Creek in Brown County, Indiana. It was built in 1994, so it is 31 years old, younger than the Indiana average of 46.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 400 vehicles a day, roughly 6% of them trucks, projected to reach 575 by 2041. The structure is 142 ft (43.4 m) long and 29 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Christiansburg Roa over Middle Fork Salt Creek built?
It was built in 1994, making it 31 years old in 2025.
What condition is Christiansburg Roa over Middle Fork Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Christiansburg Roa over Middle Fork Salt Creek carry?
About 400 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is Christiansburg Roa over Middle Fork Salt Creek?
The structure is 142 ft (43.4 m) long with a longest span of 49 ft (14.8 m) and a deck 29 ft wide.
Who owns Christiansburg Roa over Middle Fork Salt Creek?
It is owned by the County Highway Agency.